Feed mill machinery
Enter the capacity the mill runs at and how much of the output is pelleted. The list below is what that implies — intake, hammer mills, batching, mixer, pellet mill, cooler and bagging — with a rate column you fill in yourself.
Your figures
Feed mills are rated per hour, not per day.
Two shifts is typical; the third is cleaning and changeover.
Mash needs no pellet mill. Set this to zero for a mash-only plant.
One per major raw material in the formulation.
Material take-off
What to buy, at what size, and how many — worked out from the figures above.
Every line is estimated from those two figures: its steel — or steel-equivalent — mass at the steel rate, stainless at 3.2×, plus its install days at the labour rate. There is no price feed behind this, so the two anchors are seeded from typical Pakistan figures as of September 2026 and are yours to correct. Type over any individual rate and yours is used instead.
Intake & grinding
| Material | Size | No. | Total weight | Rate | Amount |
|---|---|---|---|---|---|
| Intake pit, elevator and drum sieveIntake at twice the mill rate so deliveries are not heldRate from 4,800 kg + 8 days labour — Pit grating, chain conveyor, elevator and sieve | 20,000 kg/h | 1set | — | estimated | 1,940,000 |
| Ingredient bin, MS10 days of raw material at 650 kg/m³, split across 12 binsRate from 11,406 kg + 4 days labour — Hopper-bottom bin with slide gate and level | 250 m³8.8 t each | 12bin | 105.3t | estimated | 54,869,064 |
| Hammer mill with feeder and aspirationAbout 8 tonnes an hour per mill on a 3 mm screenRate from 4,800 kg + 5 days labour — Rotor, hammers, screens, motor and air system | 10,000 kg/h | 2mill | — | estimated | 3,865,000 |
Intake pit, elevator and drum sieve
Intake at twice the mill rate so deliveries are not held
Rate from 4,800 kg + 8 days labour — Pit grating, chain conveyor, elevator and sieve- Size
- 20,000 kg/h
- No.
- 1set
- Total weight
- —
- Rate(estimated)
- Amount
- ₨ 1,940,000
Ingredient bin, MS
10 days of raw material at 650 kg/m³, split across 12 bins
Rate from 11,406 kg + 4 days labour — Hopper-bottom bin with slide gate and level- Size
- 250 m³ · 8.8 t each
- No.
- 12bin
- Total weight
- 105.3 t
- Rate(estimated)
- Amount
- ₨ 54,869,064
Hammer mill with feeder and aspiration
About 8 tonnes an hour per mill on a 3 mm screen
Rate from 4,800 kg + 5 days labour — Rotor, hammers, screens, motor and air system- Size
- 10,000 kg/h
- No.
- 2mill
- Total weight
- —
- Rate(estimated)
- Amount
- ₨ 3,865,000
Batching & mixing
| Material | Size | No. | Total weight | Rate | Amount |
|---|---|---|---|---|---|
| Batch weigh hopper with load cellsTwelve batches an hour — macro and micro weighing separatelyRate from 1,400 kg + 5 days labour — Hopper, load cells, gates and controls | 833 kg/batch | 2hopper | — | estimated | 1,145,000 |
| Twin-shaft paddle mixerUnder three minutes to a 1:100,000 coefficient of variationRate from 4,100 kg + 6 days labour — Trough, paddles, gearbox and discharge gate | 833 kg/batch | 1mixer | — | estimated | 1,655,000 |
| Liquid addition (oil, molasses) skidAround 3% of the mix as added liquidsRate from 800 kg + 3 days labour — Heated tank, pump, flow meter and spray bar | 300 kg/h | 1skid | — | estimated | 327,500 |
Batch weigh hopper with load cells
Twelve batches an hour — macro and micro weighing separately
Rate from 1,400 kg + 5 days labour — Hopper, load cells, gates and controls- Size
- 833 kg/batch
- No.
- 2hopper
- Total weight
- —
- Rate(estimated)
- Amount
- ₨ 1,145,000
Twin-shaft paddle mixer
Under three minutes to a 1:100,000 coefficient of variation
Rate from 4,100 kg + 6 days labour — Trough, paddles, gearbox and discharge gate- Size
- 833 kg/batch
- No.
- 1mixer
- Total weight
- —
- Rate(estimated)
- Amount
- ₨ 1,655,000
Liquid addition (oil, molasses) skid
Around 3% of the mix as added liquids
Rate from 800 kg + 3 days labour — Heated tank, pump, flow meter and spray bar- Size
- 300 kg/h
- No.
- 1skid
- Total weight
- —
- Rate(estimated)
- Amount
- ₨ 327,500
Pelleting
| Material | Size | No. | Total weight | Rate | Amount |
|---|---|---|---|---|---|
| Pellet mill with conditioner70% pelleted, about 10 tonnes an hour per millRate from 7,300 kg + 8 days labour — Die, rolls, conditioner, gearbox and motor | 7,000 kg/h | 1mill | — | estimated | 2,940,000 |
| Counterflow pellet coolerPellets leave the die near 85 °C and must reach ambient before storageRate from 3,520 kg + 5 days labour — Cooling column, discharge, fan and cyclone | 7,000 kg/h | 1cooler | — | estimated | 1,420,500 |
| Crumbler and pellet graderCrumbs for young birds, fines returned to the millRate from 1,300 kg + 3 days labour — Rolls, screen deck and drives | 7,000 kg/h | 1unit | — | estimated | 527,500 |
Pellet mill with conditioner
70% pelleted, about 10 tonnes an hour per mill
Rate from 7,300 kg + 8 days labour — Die, rolls, conditioner, gearbox and motor- Size
- 7,000 kg/h
- No.
- 1mill
- Total weight
- —
- Rate(estimated)
- Amount
- ₨ 2,940,000
Counterflow pellet cooler
Pellets leave the die near 85 °C and must reach ambient before storage
Rate from 3,520 kg + 5 days labour — Cooling column, discharge, fan and cyclone- Size
- 7,000 kg/h
- No.
- 1cooler
- Total weight
- —
- Rate(estimated)
- Amount
- ₨ 1,420,500
Crumbler and pellet grader
Crumbs for young birds, fines returned to the mill
Rate from 1,300 kg + 3 days labour — Rolls, screen deck and drives- Size
- 7,000 kg/h
- No.
- 1unit
- Total weight
- —
- Rate(estimated)
- Amount
- ₨ 527,500
Storage & packing
| Material | Size | No. | Total weight | Rate | Amount |
|---|---|---|---|---|---|
| Finished feed bin, MSHalf a day of production held before bagging or bulk loadingRate from 8,114 kg + 5 days labour — Hopper-bottom bin with slide gate | 150 m³6.2 t each | 4bin | 25.0t | estimated | 13,032,440 |
| Bagging and stitching line50 kg bags, weighed, filled, stitched and palletisedRate from 1,700 kg + 5 days labour — Weigher, bagger, stitcher and conveyor | 10,000 kg/h | 2line | — | estimated | 1,385,000 |
| Dust control and aspirationFeed dust is both a loss and an explosion riskRate from 2,400 kg + 6 days labour — Fans, ducting, filters and airlocks | 200 m² cloth | 1system | — | estimated | 975,000 |
Finished feed bin, MS
Half a day of production held before bagging or bulk loading
Rate from 8,114 kg + 5 days labour — Hopper-bottom bin with slide gate- Size
- 150 m³ · 6.2 t each
- No.
- 4bin
- Total weight
- 25.0 t
- Rate(estimated)
- Amount
- ₨ 13,032,440
Bagging and stitching line
50 kg bags, weighed, filled, stitched and palletised
Rate from 1,700 kg + 5 days labour — Weigher, bagger, stitcher and conveyor- Size
- 10,000 kg/h
- No.
- 2line
- Total weight
- —
- Rate(estimated)
- Amount
- ₨ 1,385,000
Dust control and aspiration
Feed dust is both a loss and an explosion risk
Rate from 2,400 kg + 6 days labour — Fans, ducting, filters and airlocks- Size
- 200 m² cloth
- No.
- 1system
- Total weight
- —
- Rate(estimated)
- Amount
- ₨ 975,000
Material
₨ 83,739,502
130.3 t of steel to fabricate
Labour
₨ 342,500
137 days at ₨ 2,500 a day
Quotation total
₨ 84,082,004PKR
12 of 12 lines priced
130.25 t is fabricated steel only. 10 bought-in lines — pumps, machines, proprietary units — are priced but carry no steel weight of ours, and show a dash in the weight column.